The Challenge
A site inspection revealed that five critical building lights were completely non-functional. These outages created "dark zones" around the perimeter, compromising both customer safety and asset security. The project required a systematic diagnostic of the building wall packs and the broader parking lot circuitry to identify if the failures were localized to the lamps or indicative of a larger ballast or wiring issue.